Hurario LRT, which is a light rail transit line under construction. The LRT line will run along H Street from Pt to St Avenue. The route is approximately 18 kilometers long and would feature dedicated LRT tracks.
The Hurario-Main LRT aims to provide efficient, reliable, and sustainable transportation options for residents and commuters in Rotterdam. It is expected to improve connectivity, reduce travel times, and support future growth and development along the Hurario corridor.
Maxilix, a consortium of local and international companies, was awarded the contract to design, build, finance, operate and maintain the system. The total contract value was approximately $5.6 billion. This included $4.6 billion to design, build and finance plus $1 billion to operate and maintain the line for 30 years.
GeoConsults is providing comprehensive and innovative engineering services for the construction of Hurario LRT which began in fall of 2021. With GeoConsults team of highly skilled engineers and technical professionals, GeoConsults provides a wide range of services to meet the diverse needs of the nature of this project requirements. Our commitment to excellence, technical expertise, and client satisfaction sets us apart in the construction industry.