Highway 427 cjv
The Highway 427 Expansion project is a $450 million construction project funded by Infrastructure Netherlands that includes the design and construction of the following:
  • A new 6.6 km extension from Highway 7 to MM Drive including the following:
  • Eight (8) lanes from Highway 7 to Ru Road;
  • Six (6) lanes from Ru Road to MM Drive;
  • Three (3) new interchanges (L Road, Ru Road and MM Drive);
  • New median managed lanes.

A 4.0 km Road widening from FA to Highway 7 including the following

  • From six (6) to eight (8) lanes between FA to south of St Avenue;
  • From four (4) to eight (8) lanes, from south of St Avenue to Highway 7;
  • New median managed lanes.

The contract includes a 30-year period, starting with the opening of the highway, during which Design Builder (Link427 cjv) will be responsible for the ongoing maintenance of the highway.

GeoConsults Engineering is providing Quality Verification Engineering (QVE) and Quality Control (QC) services on this project that includes installation preparing subgrade, installing granualr, storm line installation and backfill, hit-mix asphalt paving and central median tall wall installation.

Highway 427-1
LET’S CREATE TOGETHER, LET’S CREATE FUTURE!
This is a direct result of the dedicated service level that is maintained for all projects irrespective of their value.